TurnOver LA
162-point apartment turnover checklist · turnoverla.com · 310-774-0099
Phase 1: Move-out walkthrough (before cleaning)
Document the unit's condition before any work begins. Everything in this phase happens the same day keys are handed back.
Documentation
- Photograph every room before any work beginsDate-stamped photos are your baseline under California Civil Code §1950.5. Start at the front door and work room by room.
- Photograph all four walls of each room at eye level
- Photograph kitchen appliance interiors: oven, fridge, dishwasher
- Photograph bathroom tile, grout, tub surround, and toilet base
- Photograph all flooring: carpet, hardwood, vinyl, tile
- Photograph exterior entry, patio or balcony if present
- Create a written damage log with room, item, and severityTies each photo to a specific line on the deposit itemization you will send the outgoing tenant.
Belongings and cleanout assessment
- Confirm all tenant belongings are removed from every room
- Check all closets, including upper shelves and floor corners
- Check kitchen cabinets, drawers, and pantry
- Check bathroom vanity, medicine cabinet, and under-sink cabinet
- Check garage, storage unit, and any assigned parking areaCalifornia Civil Code §1980-1991 governs abandoned property — do not discard anything without serving written notice and observing the waiting period.
- Note any abandoned items by room and estimated value
Safety systems
- Test every smoke detector: press test button, confirm audible alarmCalifornia Health and Safety Code §13113.7 requires working smoke detectors in every dwelling unit.
- Test every carbon monoxide detector: press test button, confirm alarmCA HSC §17926 requires CO detectors in all rental units with an attached garage or gas appliances.
- Replace smoke detector batteries even if the alarm passes the test
- Replace CO detector batteries; note manufacture date and replace unit if over 7 years old
- Check HVAC filter; note install date if labeledReplace if older than 90 days. A clogged filter is the single most-missed item on most turnover inspections.
Condition survey
- Test every window and sliding door: opens, closes, latches, screen intact
- Check every exterior door: closes flush, deadbolt extends fully, weatherstripping intact
- Check every water fixture for visible drips or slow drains
- Flush every toilet; check tank components and base for leaks
- Check for pest evidence: droppings, webs, roach traces, rodent gnaw marks
- Smell for pet odor in carpet, baseboards, and closetsPet odor locked in subfloor requires treatment before new flooring or paint — identify it now, not after work begins.
- Confirm all keys, garage remotes, and access fobs are returned
- Confirm garage door opener and intercom handsets are present and working
Phase 2: Deep cleaning (kitchen, bathrooms, living spaces)
The phase that protects the most deposit dollars. A real deep clean runs 4 to 8 hours past a basic clean, hitting the surfaces a deposit dispute is fought over.
Kitchen
- Remove range hood filter and degrease in hot water or commercial degreaser
- Clean range hood interior, blades, and exhaust vent screen
- Degrease oven interior including walls, floor, and door glass
- Remove and clean oven racks and broiler pan separately
- Pull refrigerator from wall; clean floor, coils, and side panelsCoil cleaning also improves energy efficiency for the next tenant.
- Degrease door gaskets and wipe down all fridge interior shelves and drawers
- Run dishwasher clean cycle; wipe interior, door gasket, and drain filter
- Clean inside microwave including turntable and top vent
- Descale kitchen faucet aerator; wipe around base and handles
- Scrub countertops, backsplash tile, and grout lines
- Wipe inside all cabinets and drawers; remove shelf liner if soiled
- Clean cabinet and drawer fronts including hardware and hinges
- Polish stainless steel sink and appliances in grain direction
Bathrooms
- Scrub tile grout lines in shower and tub surroundUse a stiff brush and alkaline cleaner; rinse completely to prevent residue haze.
- Inspect caulk bead at tub-wall joint; clean or mark for resealing
- Descale shower head with vinegar soak; wipe exterior and escutcheon
- Descale faucet handles and spout; clean around base
- Remove and clean drain cover; clear hair and soap buildup from drain
- Clean exhaust fan grille and blade assembly with compressed air or brush
- Polish mirrors and chrome fixtures streak-free
- Clean toilet: bowl, rim, tank exterior, seat (top and bottom), and base
- Sanitize vanity interior and medicine cabinet; check mirror for loose mounting
- Wipe baseboards behind toilet and beside vanity cabinet
Living areas and bedrooms
- Wipe all baseboards and base trim hand-clean in every roomRun a damp microfiber cloth along the full length; accumulated grime is a primary deposit-deduction trigger.
- Wipe all door frames, casings, and door tops
- Clean all light switch plates and outlet covers
- Wipe ceiling fan blades, light fixture globe, and pull chains
- Clean inside all closets: shelves, rods, floor corners, and walls
- Clear dryer lint trap; wipe washer drum and door gaskets
- Clean all HVAC vents and return air grilles
- Replace HVAC filter (1-inch or 4-inch, match existing size)
Floors
- Steam clean all carpet; treat stains before steamingPre-treat pet odor stains with enzymatic cleaner 30+ minutes before steaming.
- Mop hardwood with a pH-neutral wood-appropriate cleaner
- Mop vinyl plank or LVT; avoid excess water at seams
- Scrub tile floor grout lines in kitchen and bathroom
- Sweep and mop utility closet, laundry alcove, and entryway
Windows and fixtures
- Wash interior window glass with streak-free cleaner
- Vacuum and wipe window tracks; remove salt or mineral buildupCoastal units (Venice, Santa Monica, Marina del Rey) — use a vinegar-based pre-soak for salt crystallization on aluminum tracks.
- Dust and wipe window sills and frames
- Dust mini-blinds or wipe slat-by-slat if soiled
- Remove screens, rinse, and reinstall; clean patio door tracks and threshold
Phase 3: Painting and wall prep
Paint always goes on after cleaning. Cleaning kicks grease and dust into the air, and either contaminant kills fresh-paint adhesion. A scuff repaint across a 1BR runs 4 to 6 hours; a full room repaint is 1 to 2 days.
Surface assessment
- Walk every room and flag all scuffs, nicks, holes, and stains on a room map
- Mark holes over 1/4 inch for drywall compound; mark holes over 4 inches for mesh patch
- Note areas where existing paint has chipped, peeled, or lifted from the substrate
- Check ceiling for water stains, nicotine yellowing, or bubble blistering
- Check trim and baseboard paint for chips, scuffs, and separation from wall
- Assess color drift: walls older than 24 months may need a full coat to avoid patch visibilityTouch-up paint applied to aged walls shows as a visible patch even when the paint code matches, because the original has oxidized.
Drywall prep
- Fill nail holes and anchor holes with lightweight spackle; feather flush
- Fill small holes (up to 4 inches) with joint compound over mesh patch; sand when dry
- Apply full drywall patch for larger holes; two-coat mud buildup, sand between coats
- Apply texture to match surrounding wall: orange peel, knockdown, or smoothTexture mismatch is the most visible sign of a patch and the one landlords most often underestimate.
- Prime all repaired spots before painting; allow primer to fully dry
- Lightly sand any glossy surfaces that will receive touch-up paint
Painting
- Match existing wall paint color, including age and sheen driftSpectrophotometer-based matching at Sherwin-Williams or Dunn-Edwards when paint code is unknown.
- Touch up individual scuffs and patched spots with matched paint
- Roll a full coat on any wall where scuffs or color drift exceed spot-touch quality
- Cut clean lines at ceiling and baseboard with 2-inch brush before rolling
- Paint closet interiors if marked during assessment
- Repaint trim, baseboards, and door frames with semi-gloss enamel where worn
- Sand and repaint cabinet fronts and shelving if chipped or stained
- Repaint ceiling if stained or if walls are receiving a full repaint
- Allow paint to cure fully before next tenant showing (minimum 4 hours for zero-VOC, longer for higher-VOC)Sherwin-Williams ProMar 200 Zero VOC and Benjamin Moore Ultra Spec 500 are the standard options — tenants can move in 4 hours after the last coat at typical LA temperatures.
- Document before and after photos for each painted room
Phase 4: Repairs and hardware
Repairs happen after paint, not before — fresh paint should not be contaminated by drywall dust or disturbed by hardware installation. Most LA 1BR units need 6 to 12 punch-list items between tenants.
Plumbing
- Replace P-trap if corroded, cracked, or leaking under kitchen or bath sink
- Replace toilet flapper and fill valve if running or slow to fill
- Replace faucet cartridge if dripping or hard to turn
- Replace supply line angle stops if valves are sticky or leaking
- Tighten or replace escutcheon plates at faucet and supply line bases
- Clear slow drains with drain snake or enzyme treatment
- Reseal tub or shower caulk if yellowed, cracked, or pulling away from wall
- Replace toilet seat if cracked, stained beyond cleaning, or hinges broken
Electrical
- Replace any cracked, yellowed, or broken outlet cover plates
- Replace any cracked or broken light switch cover plates
- Test and replace non-functioning outlets; check for loose wiring at receptacle
- Test GFCI outlets in kitchen and bathroom; replace if test/reset failsCalifornia building code requires GFCI protection within 6 feet of all water sources. Failing GFCI is a habitability issue.
- Replace blown dimmer switches that buzz, flicker, or do not dim correctly
- Replace all burned-out light bulbs; match wattage and base type throughout
- Rebalance ceiling fan blade if wobbling; tighten blade brackets and canopy screws
- Replace smoke detector units older than 10 years (check manufacture date on back)CA law requires sealed 10-year-battery smoke detectors in residential units. Open-battery units are no longer compliant for new installs.
- Replace CO detector units at or past their end-of-life date (typically 5 to 7 years from manufacture)
Doors, windows, and hardware
- Tighten all cabinet hinges; replace hinges that are stripped or bent
- Tighten loose cabinet pulls and drawer knobs; replace missing or broken hardware
- Adjust cabinet doors that sag, rub, or do not latch correctly
- Fix any interior door that does not latch cleanly: adjust strike plate or hinge
- Fix any exterior door that does not close flush: adjust hinges or plane door if swollen
- Replace damaged or bent mini-blinds; replace missing slats
- Replace torn or bent window screens
- Replace cracked window glass (requires glazier or window vendor for double-pane units)
- Inspect and replace weatherstripping on exterior doors if compressed or torn
- Replace missing or broken door stops; anchor new stop to baseboard, not drywall
- Reanchor closet rod if pulled from wall; use toggle bolts if no stud is accessible
- Reinstall or re-anchor loose towel bars and toilet paper holders
Locks and security
- Rekey front door knob or lever lock to a new key patternCA Civil Code §1941.3 requires functioning locks on all exterior doors. Rekeying from $100 is the minimum step every turnover should include.
- Rekey deadbolt on front door; verify deadbolt extends fully and aligns with strike plate
- Rekey secondary entry doors (back door, side gate) if keyed separately
- Rekey mailbox cylinder or arrange USPS coordination for cluster box
- Rekey or reset garage keypad and remote codes
- If smart lock is installed: reset to factory, pair with landlord master code, create new tenant codeSchlage Encode, August, and Yale setups are within scope. Reset must happen before keys-to-tenant.
- Replace knob or handle hardware if lock body is damaged beyond rekeying
- Cut new keys (minimum 2 copies) and confirm each copy works before handing off
- Document lock work with a photo of the new keys on the kitchen counter
Caulk and sealants
- Caulk any gap between baseboard and floor if separated
- Recaulk around bathtub or shower pan base if mold or cracking is present
- Caulk kitchen backsplash edges and interior window frames where sealant has cracked
Phase 5: Final walkthrough and documentation
The final walkthrough turns the work into evidence. Twelve photo checkpoints plus an itemized invoice create the record needed if any deposit deduction is challenged under California Civil Code §1950.5.
Systems check
- Run HVAC on heat mode for 15 minutes; confirm airflow at all vents
- Run HVAC on cool mode for 15 minutes; confirm airflow and temperature drop
- Test every water tap: hot and cold, full pressure, no drip
- Flush every toilet; confirm tank refills fully and valve seats correctly
- Run dishwasher through one wash cycle; check for leaks at door seal
- Test dryer on heat cycle; confirm exhaust venting is unobstructed
- Confirm all light fixtures work: overhead, under-cabinet, bathroom vanity strip
- Test all ceiling fans on every speed setting; confirm no wobble
Locks and access
- Test every rekeyed lock with the new key: smooth operation, no binding
- Test deadbolt: extends fully, retracts fully, strike plate aligned
- Test all window latches from inside
- Test patio or sliding door: rolls smoothly, latches from inside, secondary security bar present
- Test garage door: opens and closes fully, auto-reverse safety activates on obstruction; verify remote operational
Cleanliness and paint verification
- Final sniff check in each room: no pet odor, smoke, or cleaning chemical residue
- Inspect baseboards in natural light; confirm no missed grime or paint drips
- Confirm all patchwork is sanded flush and textured to match surrounding wall
- Confirm all trash, debris, and cleaning supplies are removed from property
Photo documentation
- Photograph kitchen wide shot (from doorway, all appliances visible)
- Photograph oven interior open
- Photograph behind or beside refrigerator (floor and side panel)
- Photograph each bathroom wide shot showing tub, toilet, and vanity
- Photograph shower grout and caulk line close-up
- Photograph each bedroom wide shot (from doorway)
- Photograph all closets open (shelves visible)
- Photograph HVAC filter in place (new filter, manufacture date visible if printed)
- Photograph smoke and CO detectors in place (test light green)
- Photograph front door lock face and new keys on counter
- Photograph exterior entry, patio or balcony, and any newly repaired or replaced item
RSO and deposit documentation
- Compile itemized invoice with description, cost, and date for every service performedCalifornia Civil Code §1950.5 requires itemized deductions with specific dollar amounts and supporting invoices for repairs over $125.
- For RSO or rent-stabilized buildings (LA city, Santa Monica, West Hollywood): confirm invoice format meets rent board documentation requirementsPhoto evidence and itemized invoices are required for any repair pass-through or capital improvement claim on rent-stabilized units.
- Mark unit rent-ready in your system or property management software
- Deliver keys, remotes, and access cards to new tenant at lease signing