Quick take: More Palisades and Eaton fire rebuilds are reaching completion, with 165 single family homes signed off from July to October. Owners rebuilding fire damaged LA homes can benchmark current wildfire construction requirements and compare approval routes, including standard plans and self certification.
What happened
The Good Builder reported that 165 single family rebuilds were signed off across Pacific Palisades and the unincorporated Eaton burn area from July to October, twice the January to June total. In the Palisades ZIP code 90272, the outlet counted 1,811 new single family home applications since the fires as at 7 November, with 1,386 permits issued covering 1,381 properties. County recovery data showed 2,278 Eaton rebuild cases with permits issued, under construction or complete, on 2,098 properties as at 9 November.

What it means for LA property owners
According to The Good Builder, homes on lots in designated fire hazard zones must follow California wildfire construction rules. The requirements include Class A roof covering, ember resistant vents, specified wall and eave protection, and windows with multiple panes including at least one tempered pane, or a 20 minute fire rating. The City of Los Angeles allows rebuilds to use the 2022 California code under a state executive order, while certain fire and life safety requirements still apply.
The first five feet around a building, known as Zone 0, is another item to watch. The state Board of Forestry and Fire Protection approved rules on 19 August 2026, withdrew them for clarity edits, and considered revised rules on 5 November. As at 10 November, no final regulation had been filed and no effective date was set. This is news, not legal advice. Could a local rental or rebuilding requirement apply to your property? Check with LAHD in the City of Los Angeles or an attorney.
For approvals, The Good Builder found that 78 Eaton cases referencing a county standard plan had a median application to permit time of 74 days, compared with about 150 days for other cases. The outlet noted that simpler houses may explain part of that difference. Los Angeles County's standard plans are checked once against zoning and building codes, while the City of Los Angeles has a separate Palisades standard plan pilot and still conducts final LADBS site review.
Need a turnover quote?
Send the unit address and your target date. We quote in 15 minutes.
From $225 · 48-hour turnaround
Get an instant quoteWhat to do now
- Review your design team’s fire code schedule for the roof, vents, wall assembly, eaves and windows required for the lot.
- Ask whether a county or city standard plan fits the site, and confirm what final site review remains.
- Check whether Zone 0 rules have taken effect before finalizing landscaping, fencing, mulch or attached deck details.
- Keep post completion punch list work separate from the rebuild contract. For minor maintenance items, TurnOver LA can help through repairs. Get instant quote in 30 seconds
